Avoid Wasteful Re-Designs by Managing Budget at Sketch Stage
.
Re-designs, begrudgingly accepted as a project risk, can now be eliminated from the design process while avoiding client upsets.
Traditionally, architects and designers gather the client’s brief then develop sketches and ideas that will deliver their client’s requirements.
As your design progresses the client provides feedback plus the requisite scope creep(!) to arrive at a concept that’s sufficiently mature to enable a builder or quantity surveyor to provide construction cost estimates.
Typically, this is the first time the design has been assessed practically for cost, creating a few anxious moments for all involved.
Sadly, sometimes the feedback blow’s the client’s budget to pieces.
When this happens, everyone feels the pain. The client’s dreams are shattered and they’re now asking you what went wrong….
As the professional, you’re placed in the awkward position of having to justify budget and explain that the client’s choices and directions contributed to the cost escalation.
To add insult to injury:
- You’ve spent so many hours and inspiration on a design that probably won’t be built
- The client’s demanding a re-design where you value manage – at your own expense!
- If the build doesn’t go ahead, you don’t see your vision in built form.
- You miss out on positive client referrals
Instead, Why Not Manage Budget at Sketch Stage?
To eliminate all this pain, why not check construction costs earlier in the design process?
That is, test each of your pre-concept sketches (and iterations) with ProCalc (free trial) for the likely budget impacts before the client even sees your ideas.
Then when you’re ready to share your initial thoughts with the client, you can present them more confidently with the knowledge that you already understand the likely construction costs.
This means you won’t waste hours refining a design the client can’t afford.
Additionally, you can provide budget estimates to clients early on, empowering them to approve progression or request value management much earlier in the process should it be needed.
This approach also prepares the client for the builder/quantity surveyor’s figures to avoid any ‘client-shocking’ surprises.
It puts you and your client in control.
See ProCalc Demo Video (4 mins)
Importantly, this allows the client to view you as a fellow collaborator rather than the professional who ‘has to make good at their own expense’.
For icing on the cake, the client is far more likely to progress to build because you’ve addressed any budget issues when the design was still at sketch phase.
If they needed a greater budget, they’ve approved it. If they needed reduced scope, you’ve solved it. No stress.
This approach allows you to support your designs with the required budget estimates all the way through your design process. It helps you manage client expectations (and scope creep) while eliminating those anxiety-riddled budget conversations that clients struggle to digest.
You Might Also Like:
- Industry Webinar: Stop Losing Sleep Over Client Budgets (43 mins)
- Free-trial ProCalc, the builders price guide, to see how progress more projects to build – without the grief.
- ProCalc Demonstration Video (4mins)